02 SECONDARY REFINING
Purifying Excellence:
The Secondary Refining Phase in Steel Manufacturing
The Secondary Refining Phase in Steel Manufacturing
VACUUM DEGASSING (V.D.)
- Vacuum Degassing unit – Mechanical Pumping System supplied by M/s. Edward Mech. Pumps, U.K.
- Can achieve 1m bar in 6 minutes & capable of achieving as low as 0.30 m bar.
- Help us with the production of lower gas content & cleaner steel.


35 Ton
Ladle Refining Furnance (LRF)
- Equipped with Automatic Ferro Alloy Feeding system
Cored Wire Feeding
- Cored Wire feeding at VD station helps in fine adjustment of “Ca” and in modification of inclusions & “S” content control as per customer requirement.
- It also facilitates the deep injection of additives into the steel without excessive ingress of air/oxygen.

STEPS TAKEN TO IMPROVE CLEANLINESS OF STEEL
- Controls Tapping oxygen from EAF & measured soluble oxygen with the help of celox instrument.
- Sulphur content after desulphurization is < 0.010%
- We keep VD lifting Aluminum content < 0.030%
- Mild Purging after each wire addition ‘CaSi’ and ‘S’ is minimum of 5 minutes, so that proper flotation of inclusions up into the slag.
- For sequence heats Tundish level is being maintained at approx. 3 MT minimum.
- Vesuvius Turbo Stop used in the Tundish during casting.
- EMS (Electromagnetic Stirrer) is being used in CCM.
- Hydraulic mold oscillator installation which helps us to improve the cleanliness of steel.
- Higher reduction ratio, Rolling of 50 mm diameter from 320 X 250 mm billet size.
- The first and last billets/ tundish material is not being rolled for critical grades/applications.